Monthly Archives: August 2019

August 21, 2019

The upside of the fact that it took so long to get the tour assembled and posted is that some visible progress has been made! As Picture 1 shows, the stucco is now done on most of the house and the scaffolding is down so the house is now truly visible again. We think that […]

Posted in house | Leave a comment

August 19, 2019 – House Tour: Second-floor interior & Apartment

Below is a floor-plan of the second floor. Each numbered box represents one of the following 13 photographs showing the interior of the second floor. The lines extending from each box extend to the locations on the wall that are at the edges of each image. The second floor consists of three main rooms: our […]

Posted in house | Leave a comment

August 18, 2019 – House Tour: First-floor interior

Below is a floor-plan of the first floor. Each numbered box represents one of the following 18 photographs showing the interior of the first floor. The lines extending from each box extend to the locations on the wall that are at the edges of each image. The ground floor consists of four main rooms: the […]

Posted in house | Leave a comment

August 17, 2019 — House Tour: Exterior

We had hoped to have this photo tour done 2 weeks ago, but reality intervened. Same for the house; things have been going slowly as only a father and son team having been working on it. They have done a great, if glacial job finishing the base coat of the stucco. (The subcontractor had promised […]

Posted in house | Leave a comment

August 2, 2019

This entry will be an update on the work that was completed while we were gone. We realize that some folks are less interested in the details of the building process (who knew?!) and so we are also working on something we should have done before, a tour that shows the status of the entire […]

Posted in house | Leave a comment