{"id":2023,"date":"2018-10-25T07:35:31","date_gmt":"2018-10-25T14:35:31","guid":{"rendered":"http:\/\/www.wright-macdonald.com\/blog\/?p=2023"},"modified":"2018-10-25T07:35:31","modified_gmt":"2018-10-25T14:35:31","slug":"wednesday-october-24-2018","status":"publish","type":"post","link":"https:\/\/www.wright-macdonald.com\/blog\/wednesday-october-24-2018\/","title":{"rendered":"Wednesday, October 24, 2018"},"content":{"rendered":"\n<p>The pace of progress was slower today, but some important things were done. Below you can see that they fixed the problem of the short posts. They did this by welding in new, short segments of <g class=\"gr_ gr_12 gr-alert gr_gramm gr_inline_cards gr_run_anim Grammar only-ins doubleReplace replaceWithoutSep\" id=\"12\" data-gr-id=\"12\">post<\/g>. If you look carefully at the post on the right, you can see that the area\u00a0 is redder where they repainted it after the weld.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-001-768x512.jpg\" alt=\"\" class=\"wp-image-2020\" srcset=\"https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-001-768x512.jpg 768w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-001-300x200.jpg 300w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-001-700x467.jpg 700w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-001.jpg 2000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption>Picture 1 &#8211; Short sections were welded in so that these support posts are now tall enough.<\/figcaption><\/figure>\n\n\n\n<p>They also began the preparations to pour the slab in the great room. First they had to put down a layer of several inches on sand. On top of this goes a plastic vapor barrier. That is the yellow material in this picture. On top of that goes several more inches of sand. They ran out of sand halfway through putting down the top layer, so in this picture you can see some of the bottom layer of sand, on the right, some of the finished top layer of sand, on the left, and the plastic, which still needs to be spread out to the right, in the middle. Once all of the sand is in place they will put in rebar. <br><\/p>\n\n\n\n<p>Notice also, in this and the first picture that they have attached nailer boards to I-beams that will be used to attach the joists for the floor above.<br><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004-768x512.jpg\" alt=\"\" class=\"wp-image-2019\" srcset=\"https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004-768x512.jpg 768w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004-300x200.jpg 300w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004-700x467.jpg 700w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004.jpg 2000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption>Picture 2 &#8211; Preparations for the slab in the great room.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"391\" src=\"https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004_Vers2-768x391.jpg\" alt=\"\" class=\"wp-image-2033\" srcset=\"https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004_Vers2-768x391.jpg 768w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004_Vers2-300x153.jpg 300w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004_Vers2-700x356.jpg 700w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-004_Vers2.jpg 1140w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption>Picture 3 &#8211; Fixed connection of the beams.<\/figcaption><\/figure>\n\n\n\n<p>Picture 3 is an inset from Picture 2, that highlights some of the work that they did, which I had not noticed when I was taking these photos. The circled area <g class=\"gr_ gr_29 gr-alert gr_gramm gr_inline_cards gr_run_anim Grammar multiReplace\" id=\"29\" data-gr-id=\"29\">show<\/g> that they fixed the problem I had noted on Monday. The beam that extends toward the upper right corner of the photo is now attached flush on the bottom of the taller, main beam in the great room, which runs from the left to the right sides of the picture. Although I don&#8217;t have a picture of it, this means that the other end of the beam extending to the upper left corner is now sitting directly on the concrete wall instead of being suspended two inches above it.<\/p>\n\n\n\n<p>Finally, picture 4 shows the new post that they put up that will be at the corner between the window and the sliding door in the master bedroom.<br><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1152\" src=\"https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-002-768x1152.jpg\" alt=\"\" class=\"wp-image-2021\" srcset=\"https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-002-768x1152.jpg 768w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-002-200x300.jpg 200w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-002-400x600.jpg 400w, https:\/\/www.wright-macdonald.com\/blog\/wp-content\/uploads\/D_20181024-002.jpg 1333w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption>Picture 4 &#8211; New post for the corner between a window and a sliding door.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The pace of progress was slower today, but some important things were done. Below you can see that they fixed the problem of the short posts. They did this by welding in new, short segments of post. If you look carefully at the post on the right, you can see that the area\u00a0 is redder [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-2023","post","type-post","status-publish","format-standard","hentry","category-house"],"_links":{"self":[{"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/posts\/2023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/comments?post=2023"}],"version-history":[{"count":3,"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/posts\/2023\/revisions"}],"predecessor-version":[{"id":2037,"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/posts\/2023\/revisions\/2037"}],"wp:attachment":[{"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/media?parent=2023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/categories?post=2023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wright-macdonald.com\/blog\/wp-json\/wp\/v2\/tags?post=2023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}