Wednesday, June 13, 2018

Today, they almost finished the framing for the walls supporting the deck and holding in the rainwater bag.  You may be able to see some L-shaped rebar pieces extending horizontally into the interior space at the top of the forms. These will eventually be connected into the fabric of rebar that will give strength to the slab for the deck. The top surface of the deck will be the same height as the floor of the house and the top of the green roof that will be on top of the apartment above the garage.