There was no post yesterday because the prop heads didn’t arrive, and there was no work for the guys.  Today they brought a Bobcat and started working on additional digging in the back behind the garage wall.  Then about 9:30, the FedEx truck arrived with the 437 prop heads, and they got to work putting up the posts and the racks. The two photos show the garage from inside and from up above. The racking company, who sent the wrong parts, also laid out with a computer where to put each post and rack.  In the second picture, you can see that the racks are color coded. They have not yet done the tricky part in the back triangle part of the garage. Perhaps tomorrow.