Thursday, August 23, 2018

The steel guys did show up today, but they didn’t work on the house framing.  Instead, they started removing the scaffolding from under the lower deck, which is cantilevered.  They kept the scaffolding supporting it for almost a month to give the concrete time to really dry.  The scaffolding was screwed together, and it is a real pain to take apart.  Michael, our ex-contractor neighbor, told me he thought it would take them 3 days to get it all apart.  I’m not sure if that includes removing the scaffolding around where the water bag goes or not.  This is a photo of the front of the underside of the lower deck.