Margot pointed out that the last image was missing from yesterday’s post. Sorry! It’s a mystery. If you go back to that post the image has been added, but even better might be Picture 1 here. This shows them grouting the great room tile. In it you can see the rotated field tiles and the straight set border.

Pictures 2 and 3 show that yesterday afternoon they were getting ready to put this tile down in two other places: in the hallway to the master bedroom and in the powder room, where they are putting down black, builders paper, on top of which will go metal lathe, and on the deck, where they have applied a layer of waterproofing tar.


Picture 4 shows them laying the first (and most difficult course) for more of the third wall.
