Pre-check meeting

Well, the second version of the Pre-check meeting on Thursday went off without a hitch.  The inspector lectured us for half an hour, gave us a long typed message about grading rules, and left.  Since it was going to rain on Friday, any digging work was delayed until Monday.

This entry was posted in house. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*