It looks like this will be a slow week since our contractor and his brother, who is the onsite project manager, are away in London for a family event. They did take off the forms of the new concrete that was poured last Wednesday. Picture 1 shows the lost wall and Picture 2 shows the other walls on the second floor.


Picture 3 below shows the east and south sides of the house from the stairs from the lower level of the property that leads to the main entrance.
