Monday, January 21, 2019

It might have been Martin Luther King, Jr. Day, but it this was not a holiday for the builders. Picture 1 shows that they completed the last missing piece of the replaced, high roof.

Picture 1 – Completed section of the replaced high roof.

The framer in Picture 2 is getting set up to finish the framing for the railing for the stairway to the second floor in the house

Picture 2 – Working on the framing of the railing for the stairway to the second floor.

But the exciting development today was the start of the framing for the apartment. Picture 2 shows the green lumber attached to the concrete, exterior wall surrounding the living room window. This will both provide a nailer for the Sheetrock and space for wiring and electrical boxes. Picture 3 shows the framing for walls forming the bathroom and pantry.

Picture 3 – Green (treated) lumber attached to the outer walls in the apartment.
Picture 4 – Framing for the walls of the bathroom and pantry in the apartment.

Pete and I have been working to clear the backyard in preparation for grading it. Pete then set up some portable fencing around a large grassy area next to the chicken coop, and you can see in Picture 5 that the chickens enjoy the insects and fresh grass brought on by all our rain.

Picture 5 – The chickens enjoy temporary access to an area filled with insects and new grass.
This entry was posted in house. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*