After a few days with little happening because our contractor had been away for a week and we had several days of rain, finally there was visibile progress today in two areas. First, one crew started to do some long needed clean-up of construction debris. Picture 1 shows that they have already filled their truck once and there is still much in the pile — and this is just one pile of several!

Picture 1 — Loading construction debris for removal.

The other exciting thing is that they began the framing of the second floor. Picture 2 is an overview of the framing taken from what will be the green roof on the south side of the house.

Picture 2 – Framing of the second floor.

Just before Picture 2 was taken, they were attaching a beam that will support the overhang from the front door. This is shown in Picture 3.

Picture 3 – setting the beam that will hold the overhang above the front door.

Pictures 4 and 5 show them placing another beam that is in the ceiling at the stairwell and extends out to form the overhang for the deck on the south side .

Picture 4 – Lifting one of the HEAVY beams into place.
Picture 5 – Attaching it.

Just to do any of this, as Picture 6 shows, they had to carry the materials up from the bottom of the yard and then lift them up on the second floor.

Picture 6: plywood lifted onto the second story floor.

On Tuesday the framers completed the structure of beams on the south side of the house, and added studs and beams that are not visible in Picture 7.

Picture 7 – The completed system of beams for the roof on the south side of the house.

The clean up continued along with grading of the area outside of the garage (Picture 8) and by the house (Picture 9).  For the first time in months we can now drive the truck up to the level area above the west side of the house where the solar panels are (Picture 10).

Picture 8 – Cleanup and grading of the area by the garage.
Picture 9 – Grading along the west side of the house.
Picture 10 – The road up the west side of the property to the solar panels is now accessible.