Monday, August 27, 2018

The steel guys were there today. They almost finished putting up the second side of the form for the back wall of the house above the retaining wall. They also have framed in the back door that leads outside from the kitchen. There are two more house walls that need a second layer of plywood to frame them in before they can pour the concrete. Ted says there are also some gaps in the foundation where the great room on slab joins the back part of the house over a crawlspace that need to be framed before the pour as well.