At lunchtime, the pit was considerable deeper than the picture below shows. I didn’t take a picture, and by evening, it had been filled in and compacted under the watchful eye of the soils technician.
Meanwhile, Pete was busy building a wall out of concrete pieces that will support an additional gabion in the western gully. The gabion will be wired in place on top of the concrete. You can see a few of the banana trees in the background.