Friday & Saturday, June 22-23, 2018

Apartment entry door

On Friday, the workers worked hard to get the apartment cleaned up for our interior designer to see the space around lunch time. The first picture shows the entry door into the apartment. The second shows the interior of the living room.

On Saturday, a smaller crew arrived to start taking down the forms holding up the structure of the garage ceiling. Once the many posts were removed, it is a much more spacious seeming area.

Living Room window

Wall that divides the living room from the bedroom in the apartment. This  is made of concrete to help support the load from the concrete roof.

Outside of garage with much of the interior scaffolding removed. The exterior scaffolding will be retained and used to support the next layer of scaffolding.

Interior of garage

This entry was posted in house. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*