Friday, June 29, 2018

Today they made good progress on the rebar for the garage roof (Picture 1). In the area that will hold the rainwater bladder, they also began to erect that scaffolding for the deck (Pictures 2 and 3).  We leave you with Picture 4, a view from higher up our hillside, showing the house site and the garage in context.

Picture 1 – Beginning of the rebar for the garage/apartment roof. You can see the grade beam running down the middle and the beginning of the rebar mesh in the rest of the roof. Because the load on the roof is so much less than that for the floor below, there is only the single grade beam and much less rebar generally.

Picture 2 – Scaffolding for the deck in the area that will hold the water rainwater bladder.

Picture 3 – Several of the supports for the new scaffolding.

Picture 4 – The house site and the garage from the hillside above the house.

This entry was posted in house. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*