Demo Day 8 — all done

There was only one guy there this morning moving the last two concrete piles.  When I got there, his Bobcat had stopped working again (same problem yesterday), and Pete had to fix it with his own tools. The guy moved the pile from the house pad and the pile by the garage.  There is no picture of the house pad because it looks just like yesterday minus the concrete.

The space where Pete was having the concrete dumped filled up, so the last piles were put along the top of the gully along our Western driveway.  Pete says with a couple of day laborers, he can line the gully with them in a couple of days. This picture is looking down the driveway towards the street, from just below the chicken coop. The main pile that Pete is currently working on is just to the right off the bottom of the photo.   

This entry was posted in house. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*