September 3, 2019

Margot pointed out that the last image was missing from yesterday’s post. Sorry! It’s a mystery. If you go back to that post the image has been added, but even better might be Picture 1 here. This shows them grouting the great room tile. In it you can see the rotated field tiles and the straight set border.

Picture 1 – Grouting the great room tile.

Pictures 2 and 3 show that yesterday afternoon they were getting ready to put this tile down in two other places: in the hallway to the master bedroom and in the powder room, where they are putting down black, builders paper, on top of which will go metal lathe, and on the deck, where they have applied a layer of waterproofing tar.

Picture 2 – Preparing the hall and the powder room for the same tiles as the great room.
Picture 3- The decks with tar applied. The great room tile will extend out onto the decks to minimize the boundary between the inside and outside of the house.

Picture 4 shows them laying the first (and most difficult course) for more of the third wall.

Picture 4 – Progress on the third wall.
This entry was posted in house. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*