As Picture 1 shows, the framers made great progress on the sub-floor plywood for the second floor. Picture 2 shows the floor from the southeast corner of the green roof.

Picture 1 – The house from above showing the new sub-floor plywood for the second floor.
Picture 2 – Second floor from the southeast corner of the green roof over the deck.

The concrete guys also finished the forms for the next pour. Picture 3 shows the lost wall, Picture 4, the top of the wall where the steel beam supporting the second floor concrete wall is attached, and Picture 5 the board-formed wall by the front door. Unfortunately, this concrete will not be poured on Tuesday. A friend of Nina’s has worried her about some aspects of the concrete structure and so has halted this work until our structural engineer can come out and evaluate everything.

Picture 3 – The lost wall.
Picture 4 – The top of the wall where the steel beam supporting the second floor concrete wall is attached.
Picture 5 – The board-formed wall by the front door.
This entry was posted in house. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.