Friday, July 20th, 2018

Another day of work on the deck, the final digging of footings for the foundation, and putting the resulting dirt on the slope by the garage. Picture 1 shows the scaffolding for the lower part of the deck under the oak tree. Picture 2 shows the new rebar work on the deck itself. Picture 3 shows the trenching in the area that will be the slab of the great room.

Picture 1 – Completed scaffolding under the lower part of the deck cantilevered under the oak tree.

Picture 2 – The deck itself with the rebar for the beams almost complete.

Picture 3 – Trenches for the house footings. This picture is taken from the deck, so the area in the foreground will be the slab under the great room. The trench on the right is for the foundation of the outside, eastern wall of the great room. The trench running parallel and just to the left of that first trench is for the buried duct that will bring forced air heating and cooling to the great room; this one turns the corner to also run along what will be the window walled front of the great room.

This entry was posted in house. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*