Monthly Archives: September 2018

Saturday, September 29, 2018

The framers were meant to come on Friday to cover the insulation with sheathing.  They showed up on Saturday, as we are under the threat of rain from hurricane Rosa. On Friday, the rain was forecast to start as early as Sunday night, but now we will be lucky to get much, if any rain, […]

Posted in house | Leave a comment

Friday, September 28, 2018

We have been busy packing up our house in Irvine that we are selling now, even though the new house will not be done until next summer, so we have missed a few days of blog entries. In addition to working on the wall on the west side of the great room, they have also […]

Posted in house | Leave a comment

Monday-Tuesday, September 24-25, 2018

Over the last two days they finished removing the outside forms from the walls that they poured 10 days ago, they have started putting up the rest of the forms for the first floor walls, and the plumbers have begun running the waste lines in the crawl space.

Posted in house | Leave a comment

Thursday, September 19, 2018

Today the framers came back and put up all the joists for the part of the house that has the crawlspace under it.

Posted in house | Leave a comment

Wednesday, September 19, 2018

Nina was at yoga this morning when several of the neighbors told her that “a lot of lumber was delivered to your house this morning.” It was true. There is hardly room by the house for it all. But they didn’t just get lumber delivered. Picture 3 shows that they put up all of the […]

Posted in house | Leave a comment

Monday, September 17, 2018

Since our last post they reworked the blue duct some and have installed the connectors for the floor vents that will be in the great room. Picture 1 shows one of the four of these assemblies. The box on the top of this assembly will extend higher than the floor and, I believe will eventually […]

Posted in house | Leave a comment

Wednesday, September 12, 2018

They finished putting in the blue duct today. Oddly, although there were three extra lengths of duct, a number of big fittings, and other pieces, they found that they are short some adapters that they need to connect to the floor vents. Hopefully, these will come quicker than the first order, which took 6 weeks […]

Posted in house | Leave a comment

Tuesday, September 11, 2018

I see that this is the first post in September. That is because the contractor was away on a family vacation last week and so the work just started up again today with placement of the blue duct. Today they installed the trunk that will serve the great room (Picture 1). This runs from the […]

Posted in house | Leave a comment

Friday, August 31, 2018

This was the day of the seventh (and possibly the penultimate) concrete pour. However, several other notable things happened today. The blue duct was delivered. As you can see in Picture 1, it lives up to its name! This is a special, extruded plastic duct, that can be buried or run under the slab without […]

Posted in house | Leave a comment